Add a work phase

Add a work phase

Namely:It is necessary to have created at least one Area in order to create a Work Phase.

To add a Work Area, click the button"+""located at the top right of the table'SZ-S/Processus'.

Then click on'Add Work Phase'

Complete the different fields:
Fields marked with a * must be entered.

-No.Ref= Automatic generation of a Work Phase reference.
-Site= Select the site(s) concerned by the Work Phase under creation.
-Process= Process associated with the Work Phase.- Name = Appointment of the Work Phase.
-Zone= Allows you to select the Area(s) associated with the Work Phase.
-Post affected= Parametric list to identify positions affected by this phase of work.
-Dangers= Hazards associated with the Area (up automatically completed when creating a hazard)
-Description= Potential description of the Area being created.
-Last Update= Automatic generation of the date of creation or update of the Area.- By = Automatic generation of the name of the person who created the Area.It is possible to add a file by clicking on the button

    • Related Articles

    • Add an area

      To add a Work Area, click the button"+""located at the top right of the table'SZ-S/Processus'. Then click on'Add Zones - S/Process' Complete the different fields: Fields marked with a * must be entered. - Ref = Automatic generation of a Zone ...
    • Add a danger

      To add a danger, click the button"+""located at the top right of the table'Danger-Exhibition'. Complete the different fields: Fields marked with a * must be entered. -No.Ref= Automatic generation of a Danger reference. -Site= Select the site(s) ...
    • Add a labelled product

      To access the functionality, click on"Chemical Discs".By default, the chemical registry is displayed. To register a new chemical, click the button"Add a labelled product". The registration page has 4 separate tabs. Complete the fields for each tab: - ...
    • Evaluate risks

      The risk assessment can be done either by area or by work phase by clicking the buttonassociated. On the Risk Assessment page, there is a first section recalling general information related to the Area or Work Phase. The different fields in this ...
    • Establish a standard prevention plan

      The management of prevention plans is similar to that of security protocols. Only the content of the form is different. At the register of prevention plans, click on the " button "Add a prevention plan". 1/ Tab 'Description' Chapter 'General ...