If the material request is validated, then it is possible to process this request upon receipt of the material.
Go back to the material needs register and click button
located on the line of material need to be addressed.
The need form opens and you can see a new section 'Treatment'.
After you have this section and click on "Validate".
- If the field 'Do you want to integrate the material into the BDD' was checked 'No', then we return directly to the register of material requirements.
- If this field is checked 'Yes', THEN a page to create a new material is displayed.