Dealing with a periodic assessment

Dealing with a periodic assessment

​At the vendor evaluation register (Evaluation Planning tab) the user(s) who have selected as "Evaluator" have the opportunity to record the evaluation by clicking buttonultimately located.

You have the opportunity to add an action plan under the "Conclusion".

Finally, a date field of validation of the evaluation.

Click on the " buttonValidate" to save the data and return to the evaluation schedule.

The next evaluation will then be automatically planned and the evaluation conducted will be stored in the tab 'Results of evaluations'.

    • Related Articles

    • Report a periodic assessment

      In the event that a periodic evaluation could not be completed on time, an option to defer the evaluation is available and subject to permission. To carry out a postponement, click on the icon representing aawakeningultimately on the tab 'Planning of ...
    • Modify, download and disseminate a periodic assessment

      To modify a pre-conducted periodic assessment, go to tab 'Results of evaluationsand click on the icon To release the evaluation report, click on the evaluation line and, once arrived on the form, click on the tab 'Dissemination'. At the level of this ...
    • Creating a supplier

      Suppliers can be integrated via manual creation, supplier register or import. In contrast, the supplier form of the Supplier module also contains the initial evaluation of the supplier. -If the result of this assessment is less thanthreshold for ...
    • View a supplier sheet

      Returning to an existing supplier record, we see that 2 tabs appear in addition to the supplier information page: - Tab 'Evaluations': All periodic evaluations conducted for the supplier to visualize the evolution of satisfaction. - Tab ...