Manage the lifecycle of your equipment

Manage the lifecycle of your equipment

Functionality 'Register Matrix' allows you to record all your materials and the information needed to manage them. This register is also used to download the life sheet of registered materials.

Click on the feature 'Register Matrix', you will arrive by default on the Mathematics Register page allowing you to view all recorded materials.

On this register, you can follow the expected dates of the next intervention and the date of the last intervention for each material.
It is also possible to visualize the status of each material.

It is also possible to visualize the status of each material. There are 6 different states that may appear:


States
Signification
Conforms
The material is still present in the Corporation and is found to be compliant with use as a result of potential maintenance interventions (control, revision, …)
Non-compliant
The material is still present in the Corporation but is found to be non-compliant with use following an intervention conducted (control, revision, …)
Under derogation
The material is still present in the Corporation, but its use has been subject to derogation following a completed intervention (control, revision, …)
Real estateJJ-MM-AAAA au JJ-MM-AAAA
Equipment is still present in the Corporation and is locked up for a specified period for intervention.
Not verified
The planned preventive maintenance intervention for this equipment has not been completed and the expected date has exceeded.
Beginning
The material is still present in the Society but was found to be non-compliant and discarded following an intervention.
Outing
The material is no longer present in the Society. The "Exit Date" field of the material has been completed.

Namely:it is possible to import the list of your equipment by clicking on the "Import" button.

Finally, you can export the 'Life Sheet' from the Matrix by clicking on the buttonpdfor archive it by clicking on the buttonArchiver

The Matriel archive register can be consulted by clicking on the " buttonArchives".

At the level of this registry, you can delete a material by clicking on the button representing ared crossor restore it to the General Registry by clicking on the button representing ablue river.






    • Related Articles

    • Treating a preventive maintenance intervention

      To process a preventive maintenance procedure, click on the buttonto the right of the corresponding line. The maintenance processing form is displayed. It contains all the data provided during the planning of the intervention as well as a new part ...
    • Record a maintenance procedure

      To directly record a maintenance response without prior planning (reparing emergency equipment), click on the " "Record an intervention". The form that appears is identical to the one seen in subchapter 'Treating a preventive maintenance ...
    • Register of material need

      Functionality 'Needs'Allows SymaleaN Software users to express a need for hardware. Click on the feature 'Needs', you will arrive by default on the Material Requirements Register page allowing you to view all registered applications. It is also at ...
    • Register of Material Interventions

      This feature allows the planning of maintenance interventions and their treatment. It is also possible to record an intervention directly without going through the planning phase. To access it, Click on the feature 'Maternal intervention'. As a ...
    • Request an intervention on a material

      Users who do not have permissions for recording or scheduling material response may need to make a request. A shortcut button on the home page makes it possible to make a request for intervention. After completing the form, click on the " ...