Plan a maintenance intervention

Plan a maintenance intervention

To schedule a maintenance intervention, click on the " button "Planning an intervention".

The response planning form is displayed.

Part 'Request for intervention' allows the general characteristics of the maintenance intervention to be carried out.

Complete the different fields:
Fields marked with a * must be entered.

- Mathematics: Pre-recorded and Requiring Intervention

- Category: Field for filtering the field 'Mathematics' compared to a category. Do not enter this field if the material is already selected.

-Type of intervention: Parameters

- Speaker: External or Internal. Generate a field 'Supplier' or 'Employees' depending on the choice made.

- Area of intervention: Mechanical, Electrical… (Parameterable list)

- Nature of intervention: Control, Maintenance, Review… (Parameterable list)

After completing this form, click on the " buttonValidate"

You then return to the maintenance procedure register where your new registration appears under the state "Planning".

Treatment of the intervention is done in the same way as in subchapter 'Treating a preventive maintenance intervention'.


    • Related Articles

    • Treating a preventive maintenance intervention

      To process a preventive maintenance procedure, click on the buttonto the right of the corresponding line. The maintenance processing form is displayed. It contains all the data provided during the planning of the intervention as well as a new part ...
    • Maintenance planning

      A feature of the Maintenance Module allows you to consult the schedule of various planned interventions. To access it, click on the feature 'Maintenance planning'. A number of filters allow you to display only the desired information. To initiate the ...
    • Record a maintenance procedure

      To directly record a maintenance response without prior planning (reparing emergency equipment), click on the " "Record an intervention". The form that appears is identical to the one seen in subchapter 'Treating a preventive maintenance ...
    • Request an intervention on a material

      Users who do not have permissions for recording or scheduling material response may need to make a request. A shortcut button on the home page makes it possible to make a request for intervention. After completing the form, click on the " ...
    • Process a group of maintenance interventions

      It is possible to treat multiple interventions at once. (Control of fire extinguishers, slings, pharmacy kits…) To do this, at the level of the register of interventions: 1) Check the various interventions to be addressed through the area to the ...